Earth & Sand Filling Estimator

Enter the plot size and depth, get truckloads and cost. E.g. a 40×30 ft plot raised 3 ft needs about 33 trucks.

ft
ft
ft
cft

Truck sizes vary by area — ask the driver (usually 100–200 cft)

৳

Enter one truckload price including earth and transport

%

Earth settles after filling — 10% extra is usually safe

Estimated total cost

৳1,48,500

Earth needed (net volume)
3,600 cft
Total with extra
3,960 cft
Truckloads needed
33 trucks
Earth + transport
৳1,48,500

You need about 33 trucks of earth — roughly ৳1,48,500.

How this was calculated
  1. Volume = 40 × 30 × 3 = 3,600 cft
  2. With 10% extra, total = 3,960 cft (from 3,600)
  3. Trucks = 3,960 ÷ 120, rounded up = 33
  4. Cost = 33 trucks × ৳4,500 = ৳1,48,500

How to use

  1. Enter the plot length, width and how many feet to raise (fill depth).
  2. Enter how many cft one local truck carries and the per-truck price (with earth).
  3. Keep an extra % for settling — the result shows truckloads and total cost.

Formula

Volume = length × width × depth (cft) Total = volume × (1 + extra%) Trucks = total ÷ cft per truck (rounded up) Cost = trucks × price per truck

  • 1 cft = a 1 ft × 1 ft × 1 ft cube.
  • There is no standard truck size — enter your local measure.

Worked example

40×30 ft plot, 3 ft fill, 10% extra, 120-cft trucks at Tk 4,500 each:

Volume = 40 × 30 × 3 = 3,600 cft. With extra = 3,600 × 1.1 = 3,960 cft. Trucks = 3,960 ÷ 120 = 33. Cost = 33 × Tk 4,500 = Tk 148,500.

What to know in Bangladesh

  • Measure first, price later: a “truck” can be a small pickup or a big dump truck — confirm the cft before comparing prices.
  • Fill in the dry season: cutting and carrying earth is easier and cheaper from November to March.
  • Allow for settling: fresh fill sinks a few inches over 6–12 months — let it settle or roll-compact before building.
Details: how to measure and compare prices

Measure length and width with a tape in feet. Depth means how high above the current soil you want to go — match the nearby road or neighbours so rainwater does not pool.

When comparing quotes ask: (1) cft per truck, (2) earth type, (3) whether transport is included, (4) whether unloading labour is included. Only then is the comparison fair.

Frequently asked questions

How many cft does one truck carry?

100–200 cft depending on the area and vehicle — there is no standard size. Ask the driver or seller and enter it in the calculator.

How many trucks for a 40×30 ft plot raised 3 ft?

Volume is 40×30×3 = 3,600 cft. With 10% extra that is 3,960 cft — 33 trucks of 120 cft. At Tk 4,500 per truck the total is Tk 148,500.

Why keep an extra %?

Fresh earth settles and some is lost in handling. 10% extra is safe for new filling; 5–10% is enough for sand.

Earth or sand — which is better for filling?

Homestead bases usually take clayey earth below with a sand layer on top. Pure sand drains fast but costs more. Ask a local mason.

Also searched as

earth filling calculator · sand filling cost · truck hisab mati · pond filling cost bangladesh