Brick, Cement and Sand Calculator

A 10 ft long, 10 ft high, 10-inch wall in 1:6 mortar at 5% wastage needs about 1,008 bricks, 3 bags of cement and 22 cft of sand. Pick the work type and enter your sizes below.

Work type
Measured in
Feet
Feet
Wall thickness
Mortar ratio (cement : sand)
sq ft

Total area of all openings, e.g. a 3 × 7 ft door = 21

%

Broken bricks, dropped mortar etc. — usually 5–10%

Add prices to see the cost (optional)
৳
৳
৳

You need (with wastage)

1,008 bricks · 3 bags cement · 22 cft sand

Bricks
1,008
Cement
2.88 bags (≈ 144 kg) → buy 3
Sand
21.57 cft
Area
100 sq ft
Wall volume
83.33 cft
Wet mortar (between bricks)
18.02 cft
Dry materials (total)
25.17 cft

For this brick wall you need about 1,008 bricks · 3 bags cement · 22 cft sand.

How this was calculated
  1. Area = 10 × 10 = 100 sq ft; volume = 100 × 10 in ÷ 12 = 83.33 cft.
  2. One brick with mortar = 10″ × 5″ × 3″ = 150 cu in. Bricks = 83.33 × 1,728 ÷ 150 = 960.
  3. Brick alone = 9.5″ × 4.5″ × 2.75″ = 117.56 cu in. Wet mortar = 83.33 − 960 × 117.56 ÷ 1,728 = 18.02 cft.
  4. 5% wastage added (to every material).
  5. Dry materials = 18.02 × 1.05 (wastage) × 1.33 (dry-volume factor) = 25.17 cft.
  6. Cement = 25.17 ÷ 7 (sum of the ratio) = 3.6 cft; 1 bag ≈ 1.25 cft, so 2.88 bags.
  7. Sand = 3.6 × 6 = 21.57 cft.

How to use

  1. Pick the work type: brick wall, plaster or concrete.
  2. Enter length and height (width for concrete) in feet or metres.
  3. Pick wall/plaster thickness and the mortar ratio. If there are doors or windows, enter their total area to leave it out.
  4. Enter wastage; usually 5–10%.
  5. Add brick, cement and sand prices if you want the cost too.

Brick, cement and sand formulas

Brick wall

  • Wall volume (cft) = length × height × thickness (inches) ÷ 12
  • Bricks = volume × 1,728 ÷ 150 (one brick with mortar is 10″ × 5″ × 3″ = 150 cu in)
  • Wet mortar = volume − bricks × 117.56 ÷ 1,728 (bare brick 9.5″ × 4.5″ × 2.75″)
  • Dry materials = wet mortar × 1.33
  • Cement (cft) = dry ÷ (sum of the ratio); bags = cement ÷ 1.25
  • Sand = cement (cft) × sand parts

Plaster: wet volume = area × thickness ÷ 12; × 1.2 for filling brick joints and the uneven wall face, then the same × 1.33 rule. Openings: for walls and plaster, area = length × height − total door and window area. Concrete: wet volume × 1.54 = dry materials; in 1:2:4 the sum is 7, so cement = dry ÷ 7, sand twice that, aggregate 4×.

Wastage adds at the same rate to every material. Buying counts round bricks, bags and cft upwards.

Examples

10-inch wall: 20 ft long, 10 ft high, 1:6 mortar, 5% wastage. Volume = 200 × 10 ÷ 12 = 166.67 cft. Bricks = 166.67 × 1,728 ÷ 150 = 1,920, 2,016 with wastage. Wet mortar 36.04 cft; dry = 36.04 × 1.05 × 1.33 = 50.33 cft. Cement = 50.33 ÷ 7 = 7.19 cft = 5.75 bags (buy 6 bags), sand = 7.19 × 6 = 43.14 cft. At Tk 14 a brick, Tk 550 a bag and Tk 45 a cft of sand (example prices): bricks Tk 28,224 + cement Tk 3,300 + sand (44 cft) Tk 1,980 = Tk 33,504. With a 3 × 7 ft door and a 5 × 3 ft window in the same wall (36 sq ft), the area drops to 164 sq ft: 1,654 bricks, 4.72 bags of cement (5 bags) and 35.38 cft of sand.

Roof slab: 20 × 15 ft, 5 inches thick, 1:2:4, 5% wastage. Volume 125 cft; dry = 125 × 1.05 × 1.54 = 202.13 cft. Cement 23.1 bags (24 bags), sand 57.75 cft, aggregate 115.5 cft.

Per 100 sq ft (no wastage)

Work Bricks Cement (bags) Sand (cft)
5-inch wall, 1:4 480 1.92 9.59
5-inch wall, 1:6 480 1.37 10.27
10-inch wall, 1:4 960 3.83 19.17
10-inch wall, 1:6 960 2.74 20.54
½-inch plaster, 1:4 — 1.06 5.32
½-inch plaster, 1:6 — 0.76 5.70
¾-inch plaster, 1:4 — 1.60 7.98
5-inch concrete, 1:2:4 — 7.33 18.33 (aggregate 36.67)

What to know in Bangladesh

  • Brick size: standard first-class brick 9.5″ × 4.5″ × 2.75″ (240 × 115 × 70 mm), 10″ × 5″ × 3″ with half-inch joints. Many kiln bricks run smaller; then the same wall takes more bricks. Measure a few before buying.
  • 5-inch walls are usually inner partitions, mortar 1:4. 10-inch walls are outer or load-bearing, often 1:6 or 1:5. Follow the design.
  • A cement bag is 50 kg, about 1.25 cft by volume.
  • Sand: coarse sand (Sylhet sand or equal) for masonry and casting, usually medium/fine sand for plaster. Wet sand bulks, so cft measures vary a little.
  • Wastage: bricks break on site, mortar drops, joints run thick; allow 5–10%. Size roof slabs and load-bearing quantities to the engineer’s design.
How the math works, in detail

Masonry counts the wall as a box filled with small “brick-with-mortar” blocks. Each brick is 9.5″ × 4.5″ × 2.75″, and with half an inch of mortar around it each block is 10″ × 5″ × 3″ — 150 cu in. One cft holds 1,728 cu in, so each cft of masonry holds 11.52 bricks.

Subtract the bricks’ own volume from the wall volume and the rest is wet mortar — about 0.22 cft per cft of masonry.

Dry sand-cement settles when water is added, and mortar also fills grooves and uneven spots. So dry materials run higher than wet mortar. The 1.33 factor used here is the engineers’ convention in the country. Some use 1.27 plus separate wastage; results land close. Casting also fills stone gaps, hence 1.54 there.

Plaster has one more allowance: a brick wall is never perfectly flat, and plaster fills the joint grooves too. The usual estimating practice adds 20% to the wet plaster volume before the 1.33 factor. On a very uneven wall, raise the wastage a little more.

Then split by ratio. 1:6 means 1 part cement and 6 parts sand out of 7. Cement cft divided by 1.25 gives bags.

This estimates shopping quantities. Real brick size, joint thickness, sand moisture and the mason’s hand all shift actual use a little.

Frequently asked questions

How many bricks per square foot of 10-inch wall?

One brick with mortar counts as 10″ × 5″ × 3″. That gives 9.6 bricks per sq ft for a 10-inch wall and 4.8 for a 5-inch wall. Add 5–10% wastage. A 100 sq ft 10-inch wall needs 960 bricks before wastage.

How much brick, cement and sand for 100 cft of masonry?

Before wastage: 1,152 bricks and about 21.63 cft of wet mortar. In 1:6 mortar that takes 3.29 bags of cement and 24.65 cft of sand.

Why the 1.33 dry-volume factor?

Dry sand-cement shrinks when water is added, and mortar fills gaps and uneven joints. So dry materials run 1.33× the wet mortar. Concrete also fills stone gaps, hence 1.54 there.

How many cft in one bag of cement?

A 50 kg bag counts as about 1.25 cft. This calculator divides cement cft by 1.25 for bags.

How much cement-sand for plaster?

Plaster on brick also fills the joint grooves and uneven face, so 20% is added to the wet volume. On that basis 100 sq ft of wall with ½-inch 1:4 plaster takes 1.06 bags and 5.32 cft of sand before wastage; ¾-inch 1:6 takes 1.14 bags and 8.55 cft.

What does 1:2:4 mean, and how much cement for casting?

1 part cement, 2 sand, 4 aggregate. A 10 × 10 ft, 5-inch slab in 1:2:4 takes 7.33 bags of cement, 18.33 cft of sand and 36.67 cft of aggregate before wastage.

Should door-window openings be deducted?

Yes. For walls and plaster, enter the total door and window area (length × height) in the openings box and the calculator leaves it out. A 3 × 7 ft door is 21 sq ft and a 5 × 3 ft window 15 sq ft, 36 in all.

Why do real sites need more bricks than the math?

Kiln sizes vary, bricks break, joints run thick. Smaller bricks mean more per wall. Allow 5–10% wastage, and match big jobs with the engineer or contractor.

Also searched as

brick sand cement calculation · bricks needed for 10 inch wall · plaster cement sand ratio · it balu cement hisab · brick calculator bd