New Electricity Connection Cost

A 2 kW residential single-phase connection costs ≈ Tk 1,440 upfront (deposit 960 + application 120 + installation 360), plus Tk 40/month meter rent.

Connection type
Meter / phase
kW

Total capacity of appliances you run together — overstating it raises the deposit

Upfront cost (with deposit)

৳1,440

Security deposit (480/kW)
৳960
Application fee
৳120
Meter installation
৳360
Upfront total
৳1,440
Monthly meter rent
৳40 per month
Remember
Pole/line-extension cost is extra — quoted in the demand note after survey.

A Residential 2 kW connection costs ≈ ৳1,440 upfront, plus ৳40 meter rent every month.

The final amount comes in the demand note after survey; pole or line-extension cost and house wiring are extra.

How this was calculated
  1. Deposit = 2 kW × ৳480 = ৳960
  2. Application fee (Single phase) = ৳120
  3. Meter installation (Single phase) = ৳360
  4. Upfront = ৳960 + ৳120 + ৳360 = ৳1,440
  5. Monthly meter rent (Single phase) = ৳40

How to use

  1. Pick the connection type (residential / commercial / MT) and single or three phase.
  2. Enter the sanctioned load in kW — total capacity of appliances you run together.
  3. The result shows deposit, application fee, installation, upfront total and monthly meter rent.

Fee table (BERC SRO-43/2024)

Item Rate
Deposit — residential (up to 2 kW) Tk 480/kW
Deposit — residential (above 2 kW, whole load) Tk 720/kW
Deposit — commercial / small industry Tk 960/kW
Deposit — MT / HT Tk 1,200/kW
Application — single / three phase Tk 120 / 360
Meter installation — single / three phase Tk 360 / 480
Monthly meter rent — single / three phase Tk 40 / 250

Formula: upfront = deposit (load × rate) + application fee + installation. Meter rent is added to the bill every month.

Worked example

2 kW residential, single phase:

Deposit = 2 × Tk 480 = Tk 960. Add application Tk 120 + installation Tk 360: upfront = 960 + 120 + 360 = Tk 1,440. Monthly meter rent Tk 40.

Steps to get connected

  1. Apply — at the local distribution office or online portal (with the application fee).
  2. Survey — the office inspects the premises to verify load and line conditions.
  3. Demand note — the final payable amount based on the survey; pole or line-extension cost, if needed, appears here.
  4. Payment and meter — once paid, the meter is installed and the connection goes live.
Details: how to size your sanctioned load

Sanctioned load means the maximum kW you will draw at once. Add up the watts of appliances that run together — fridge, pump, AC, motor — and divide by 1,000 (1,000 W = 1 kW).

Do not oversize it: the deposit is charged on the load, and for residential connections crossing 2 kW pushes the whole load to the Tk 720 rate. But do not undersize either — overloading can burn the meter and brings penalties plus the hassle of a load upgrade. Estimate honestly with a little headroom.

Frequently asked questions

Is the cost the same for DESCO, DPDC and Palli Bidyut?

Yes. BERC SRO-43/2024 is a national schedule, so deposit, application, installation and meter-rent rates are identical across distributors (DESCO, DPDC, NESCO, BREB/PBS). Only pole or line-extension cost varies — it comes in the demand note after survey.

Is the security deposit refundable?

Yes, it is a refundable deposit. When the connection is permanently disconnected, dues are adjusted and the rest is returned — keep your receipts and papers safe.

How long does it take to get a meter after applying?

Application → survey → demand note → payment → meter installation — these steps normally take weeks. DESCO/DPDC portals and SMS updates let you track the application.

What is the deposit for residential load above 2 kW?

Up to 2 kW the rate is Tk 480/kW, but above 2 kW the whole load is rated at Tk 720/kW — e.g. 5 kW means a deposit of 5 × 720 = Tk 3,600.

Is meter rent paid every month?

Yes, meter rent is monthly and comes with the electricity bill — Tk 40 for single phase, Tk 250 for three phase.